Emobitaly Livorno Ferrarischarging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Emobitaly (Italy) http://www.emobitaly.it/come-ricaricare/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Equipment & Location Confirmed Correct ]Una sola tipo 2 con cavo integrato, disponibile gratuitamente h24. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-emobitaly-livorno-ferraris-vc-piazza-camillo-corio-t9800.html
https://www.forumelettrico.it/forum/colonnina-emobitaly-livorno-ferraris-vc-piazza-camillo-corio-t9800.html Comment by ForumElettrico.it 03/16/2021 17:21:29
Other Charging Locations
There are 9 matching results
Bianzè Piantale BECHARGE
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Strada Statale 11 Padana Superiore
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Semm Borgo d'Ale
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
EnelX Fast Moncrivello Brikò
2
3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Lamporo Deva | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Borgo d'Ale Matteotti | BeCharge
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Parco del Babi Castell'apertole
1
3
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Emotion AdS San Rocco Sud
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Municipio Di Crescentino
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-03-16
Uploaded by ForumElettrico.it on 2021-03-16
Uploaded by ForumElettrico.it on 2021-03-16
Uploaded by ForumElettrico.it on 2021-03-16
Uploaded by ForumElettrico.it on 2021-03-16
Uploaded by aldodal on 2018-03-31
Uploaded by aldodal on 2018-03-31