LIDL Fidenzacharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Lidl https://info.lidl/en
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Failed to Charge (Equipment Not Operational) ]Entrambe le prese fuori uso: pare partire la ricarica ma dopo pochi secondi si interrompe... copione già visto nella maggior parte dei Lidl d'Italia. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/post178945.html#p178945
https://www.forumelettrico.it/forum/post178945.html#p178945 Comment by ForumElettrico.it 02/18/2021 16:51:22
[ General Comment , Did Not Visit Location ] https://www.forumelettrico.it/forum/lidl-fidenza-colonnina-plug-play-per-i-clienti-t2605.html Comment by ForumElettrico.it 04/13/2018 08:13:06
[ General Comment , Charged Successfully ]https://www.forumelettrico.it/forum/lidl-fidenza-colonnina-plug-play-per-i-clienti-t2605.html
Comment by ForumElettrico.it 04/13/2018 08:12:54
Other Charging Locations
There are 9 matching results
METANO FIDENZA
1
2
Public
Operational
Level 2 : Medium (Over 2kW)
SCAME Type 3C (Schneider-Legrand)
Centro Commerciale Fidenza | EnelX
2
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Foro Boario Fidenza | EnelX
2
8
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Parco della Pace Fidenza | EnelX
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Cimitero Centrale Fidenza | EnelX
2
9
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Fidenza Zaccagnini | EnelX
2
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Mazzini
3
10
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Fidenza Vittoria | EnelX
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Fidenza Cefalonia | EnelX
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-02-18
Uploaded by ForumElettrico.it on 2021-02-18
Uploaded by ForumElettrico.it on 2018-04-13
Uploaded by ForumElettrico.it on 2018-04-13
Uploaded by ForumElettrico.it on 2018-04-13
Uploaded by ForumElettrico.it on 2018-04-13
Uploaded by ForumElettrico.it on 2018-04-13