Lidl Peschiera del Garda BIScharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Lidl https://info.lidl/en
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]https://www.forumelettrico.it/forum/colonnina-ac-lidl-peschiera-del-garda-vr-bis-via-bell-italia-t2684.html
Comment by ForumElettrico.it 04/29/2018 06:41:01
Rating: 4 out of 5 [ General Comment , Charged Successfully ] https://www.forumelettrico.it/forum/colonnina-ac-lidl-peschiera-del-garda-vr-bis-via-bell-italia-t2684.html Comment by polianto 04/27/2018 19:45:23
Other Charging Locations
There are 9 matching results
EWiva Località Sermana
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Lidl Peschiera del Garda
3
3
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
ENEL X Tangenziale Peschiera Del Garda
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Del Garda Village and Camping
2
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ionity Peschiera
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
T-Carica
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Eni
1
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Migross Santa Maria di Lugana
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
NEOGY Via Venezia
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)