To edit, add comments or upload photos: Sign In
Enel X Collepardocharging location
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
2
Usage:
Public - Membership Required
Operational Status:
Operational
Latitude:
41.7632686136064
Longitude:
13.3681256474536
OCM Ref: OCM-107852
Network/Operator
Enel X https://eneldrive.enelx.com/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-152295
22 kW
AC (Three-Phase)
400 V
32 A
SCAME Type 3A (Low Power)
Operational
OCM-CN-165412
3.7 kW
AC (Single-Phase)
240 V
16 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Viale Pietro Sterbini
1.62 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Via Chiappitto
2.35 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Parcheggio
2.56 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Via Conte Giuseppe Celani
3.78 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Campo Catino
5.23 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Parcheggio Colle Silvi
7.47 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ewiva Via Bagni Roana
7.57 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Parcheggio Martellina
7.63 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Silva Hotel Splendid
1
7.9 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)