Emotì Evpass Pollegio Via San Gottardocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
EVPass (CH) https://www.evpass.ch/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Type 1 (J1772)
T13 - SEC1011 ( Swiss domestic 3-pin ) - Type J
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Emotì Evpass Via Generale Guisan Biasca
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Hotel Nazionale
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Emotì Evpass posteggio Chiesa Malvaglia
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Casa Comunale
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Camping Gottardo in Chiggiogna
3
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Tesla Supercharger Arbedo-Castione
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Emotì Evpass Faido Via Gerra
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Emotì Evpass Stazione di Castione-Arbedo
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Casa Comunale di Lumino
1
1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In