Sebi Zöldáram DC electric charger charging location

Nearest Address:
Szluha György utca 7.
Szekszárd
Tolna megye
7100
Hungary

+36303070501
General Information:

Start charging with https://map.gyorstoltok.hu or with QR code HELPDESK: +36303070501 ; [email protected]

This charging location has not been recently verified and you should not rely solely on this information for journeys.

If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.

If the details are inaccurate please edit them.

Number Of Stations/Bays: 4
Usage: Public
Usage Cost: EUR 0.30,-/kWh for DC charging. EUR 0.27,-/kWh for AC charging
Operational Status: Operational
Latitude: 46.355179
Longitude: 18.704952
OCM Ref: OCM-108319
Network/Operator

(Business Owner at Location)

Data Provider:

Open Charge Map Contributors http://openchargemap.org

Data License:

Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report


Data Quality Score: 90 out of 100
  •   User Feedback - No recent user verification.
  •   User Feedback - Has comments or check-ins
  •   User Feedback - Has photos
  •   Data Completeness - Usage Type Known
  •   Data Completeness - Operational Status Known
  •   Data Completeness - Equipment Details Present

Type 2 (Tethered Connector)

Operational
1 Present
OCM-CN-153130
43 kW AC (Three-Phase)
400 V
63 A

Type 2 (Socket Only)

Operational
1 Present
OCM-CN-153131
22 kW AC (Three-Phase)
400 V
32 A

CCS (Type 2)

Operational
1 Present
OCM-CN-586552
50 kW DC
500 V
120 A

Open for all users 0-24h

CHAdeMO

Operational
1 Present
OCM-CN-586553
50 kW DC
500 V
120 A

Open for all users 0-24h

Add your own comment/check-in for this location:

Sign In
Rating: 5 out of 5 [ General Comment , Charged Successfully ]

Új 50 kW teljesítményű DC elektromos autó töltőállomást helyeztek üzembe 2024 decemberében. Az új nagyteljesítményű töltő készüléken megtalálhatóak a CHAdeMO és CCS szabványú csatlakozók is. Töltést indítani lehetséges webes felületen keresztül a https://map.gyorstoltok.hu oldalról, QR kóddal és készpénzes fizetésre is van lehetőség a helyszínen a személyzet által. A new 50 kW DC electric car charging station was put into operation in December 2024. The new high-performance charger also features CHAdeMO and CCS standard connectors. Charging can be started via a web interface at https://map.gyorstoltok.hu, with a QR code and cash payment is also possible on site by staff.

Comment by Jegesjeles 12/27/2024 19:27:41

Other Charging Locations

There are 9 matching results

Szekszárd, Piactéri parkolóház
  1

Vár köz 2.
Szekszárd
Tolna
7130
Hungary
View
0.39 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Polgármesteri hivatal
  1

Béla király tér 3
Szekszárd
Tolna
Hungary
View
0.51 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO

Szekszárd, Csokonai utca
 

Csokonai utca 11-13.
Szekszárd
Tolna megye
7100
Hungary
View
0.56 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Szekszárd, Dr. Szentgáli Gyula utca
 

Dr. Szentgáli Gyula utca 2.
Szekszárd
Tolna megye
7100
Hungary
View
0.65 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Szekszárd, Strandfürdő
 

Sport utca 2.
Szekszárd
Tolna
7100
Hungary
View
0.66 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

GRID (evDirect) Szekszárd M6 VW AutoCity
  1

Rákóczi utca 156
Szekszárd
Tolna megye
7100
Hungary
View
1.32 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Szekszárd, Halász Klinika
 

Bródy Sándor utca 23.
Szekszárd
Tolna megye
7100
Hungary
View
1.33 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)

Nova Futura Zrt. 003 50 kW DC + 22 kW AC Free WiFi
3   5

Gém utca 1.
Tolna
7130
Hungary
View
5.22 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Apponyi Kiskastély
  3

Rákóczi Ferenc utca 21.
Medina
Tolna megye
7057
Hungary
View
8.3 Miles
Privately Owned - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Upload your own photos for this location: Sign In

perfect charging stations

Uploaded by Jegesjeles on 2024-12-27

the new charging stations

Uploaded by Jegesjeles on 2024-12-27

a new DC charging station

Uploaded by Jegesjeles on 2024-12-27

Uploaded by bivett on 2020-10-08

Uploaded by bivett on 2020-10-08