To edit, add comments or upload photos: Sign In
Hotel Bel Air - Brasserie la Terrassecharging location
Nearest Address:
1 Allée Bel Air
Le Haillan
Gironde
33185
France
+33 5 56 04 08 50
General Information:
2 Tesla Connectors, up to 11kW.Available for customers. Please call ahead.
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
2
Usage:
Public - Membership Required
Operational Status:
Operational
Latitude:
44.867993
Longitude:
-0.669918
OCM Ref: OCM-109374
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Operational
2 Present
OCM-CN-154492
11 kW
AC (Three-Phase)
400 V
16 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Ecomobiles 33
0.39 Miles
(Unknown)
Operational
(Unknown)
Operational
14 RUE FRANCOIS ARAGO 33700 MERIGNAC
0.85 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
TotalEnergies - Relais Acquitaine
1.18 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
TotalEnergies - Relais Gironde Merignac
1.24 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
WARNING - Bordeaux
1.39 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Auto Malin | Mérignac
1.57 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Engie-Vianeo - B&B Hôtel Bordeaux-Mérignac HDV
1.62 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Bump - Holiday Inn Bordeaux - Merignac
1.67 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Rue des Châtaigniers
1.8 Miles
Operational
Level 3: High (Over 40kW)
CHAdeMO
Operational
Level 3: High (Over 40kW)
CHAdeMO
Upload your own photos for this location: Sign In