Tim Horton'scharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
5am-11pm daily
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
85198
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CHAdeMO
kW power is an estimate based on the connection type
CCS (Type 1)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Niagara Parks - Maintenance centre
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
OPG
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Niagara Parks Commission
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Parkway Condominiums
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Wingate by Wyndham - Niagara Falls.
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Cambria Hotel - Niagara Falls
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
CAMBRIA HOTEL RAINBOW 01
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Hampton Inn Rainbow Blvd
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
CAMBRIA HOTEL RAINBOW 02
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Upload your own photos for this location: Sign In