Hampton Inncharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
83629
Data Quality Report
Data Quality Score: 60 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Unknown Operational Status
- Data Completeness - Equipment Details Present
CHAdeMO
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
THE CMM THE CMM #1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Millbrook - NS Power Fast Charging
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Nova Scotia Power Truro Depot
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Nova Scotia Power Inc
Private - Restricted Access
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Best Western Glengarry
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
ALL EVS WELCOME TRURO MAZDA
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Glooscap Heritage Centre
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
TOWN OF TRURO STATION 1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Vantage Motors
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Upload your own photos for this location: Sign In