Washington State Department of Ecology - Public Parking Lotcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
104058
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Spokane Public Schools - Shadle Park High School
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Holy Family Hospital Employee
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
NCU CT ST CT4K 1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Greenlots - 52080
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
WSECU N.DIVISION #01
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Avista - 5 Mile STA DCFC
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Northstar Lodge - Northstar Lodge Aparments
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
FOOTHILLS MAZDA MAZDA01
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Progress Professional Center
2
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In