Mission Memorial Hospitalcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily; Drivers must bring their own J1772 cordset for Level 1 charging
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
94916
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
NEMA 5-20R
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
BC Hydro - Mission - Superstore
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
River Valley Ford Mission, BC
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Greenlots - 33109
Public
Unknown
Level 3: High (Over 40kW)
CHAdeMO
Elevate Developments - Outlook Village 2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Elevate Developments – Outlook Village 3
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Elevate Developments - Outlook Village
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
River Valley Ford Mission
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Outlook Village - Tesla Supercharger
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
On the Run EV Fast Charge
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Upload your own photos for this location: Sign In