To edit, add comments or upload photos: Sign In
COOP Busto Arsiziocharging location
General Information:
15 min free 90 min free + shopping oltre parcheggio a pagamento
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
2
Usage:
Public
Operational Status:
Operational
Latitude:
45.61445516829775
Longitude:
8.855870722015766
OCM Ref: OCM-112277
Access Information:
8.30 - 20.30
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-157887
22 kW
AC (Three-Phase)
CHAdeMO
Operational
OCM-CN-158072
50 kW
DC
CCS (Type 2)
Operational
OCM-CN-158073
50 kW
DC
Add your own comment/check-in for this location:
Sign In[ General Comment , Did Not Visit Location ]Colonnina di recente sostituita
Comment by ForumElettrico.it 02/05/2020 17:04:04
[ General Comment , Charged Successfully ] https://www.forumelettrico.it/forum/colonnina-coop-busto-arsizio-viale-duca-d-aosta-t8196.html Comment by ForumElettrico.it 12/09/2019 17:52:56
Other Charging Locations
There are 9 matching results
AGESP SERVIZI
0.35 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
BeCharge Busto Arsizio Stazione FNM
0.58 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
U2 Supermercato Busto Arsizio | EnelX
0.84 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Olgiate Olona San Giorgio | EnelX
1 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BECHARGE Busto Arsizio Morelli
1 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
LIDL Busto Arsizio
1.05 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Autosalone Internazionale Srl Castellanza
1.05 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Olgiate Olona Pertini | EnelX
1.24 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BECHARGE CASTELLANZA MultiMedica
1.29 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2020-02-05
Uploaded by ForumElettrico.it on 2020-02-05
Uploaded by ForumElettrico.it on 2020-02-05
Uploaded by ForumElettrico.it on 2020-02-05
Uploaded by ForumElettrico.it on 2019-12-09
Uploaded by aldodal on 2018-10-27
Uploaded by aldodal on 2018-10-27