Cene 4 Novembre | EnelXcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ] Comment by zedestel 10/25/2020 15:50:36
[ Fault Report (Notice To Users And Operator) , Failed to Charge (Equipment Not Operational) ]Non operativa
Comment by zedestel 09/10/2019 13:56:48
[ Fault Report (Notice To Users And Operator) , Failed to Charge (Equipment Not Operational) ] Comment by zedestel 09/10/2019 08:39:33
[ General Comment , Charged Successfully ] https://www.forumelettrico.it/forum/colonnina-enelx-22-kw-cene-piazza-4-novembre-t4146.html Comment by ForumElettrico.it 11/28/2018 07:45:35
Other Charging Locations
There are 9 matching results
Municipio Di Cene | EnelX
3
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
U2 supermercato | EnelX
1
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Cene
3
(Unknown)
Not Operational
Gazzaniga Manzoni | EnelX
1
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Gazzaniga Stazione | Ressolar
2
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Vall'Alta I Maggio | EnelX
1
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Municipio di Albino | Ressolar
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Albino La Pira | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Parcheggio Funivia Albino-Selvino | EnelX
1
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by zedestel on 2020-10-25
Uploaded by zedestel on 2019-09-12
Uploaded by zedestel on 2019-09-12
Uploaded by ForumElettrico.it on 2018-11-28
Uploaded by ForumElettrico.it on 2018-11-28