Stiatico Alessandrini | EnelXcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
SCAME Type 3A (Low Power)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Tutto ok utilizzando NFC Enel X per avviare e il pulsante sulla presa auto per interrompere. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/post210885.html#p210885
https://www.forumelettrico.it/forum/post210885.html#p210885 Comment by ForumElettrico.it 06/05/2021 10:56:38
[ General Comment , Charged Successfully ] https://www.forumelettrico.it/forum/colonnina-enel-x-22-kw-san-giorgio-di-piano-bo-via-alessandrini-7-stiatico-t7840.html Comment by ForumElettrico.it 11/10/2019 18:06:45
Other Charging Locations
There are 9 matching results
DriWe EcorNaturaSì Interporto
1
4
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
DriWe EcorNaturaSì Interporto
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ewiva Interporto
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Interporto Bologna S.p.A.
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
CEE 5 Pin
Be Charge Municipio
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Funo
2
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
San Giorgio Rimembranza | EnelX
2
9
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
San Giorgio di Piano Stalingrado | EnelX
1
4
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Funo
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-06-05
Uploaded by ForumElettrico.it on 2019-11-10
Uploaded by ForumElettrico.it on 2019-11-10
Uploaded by ForumElettrico.it on 2019-11-10
Uploaded by ForumElettrico.it on 2019-11-10