ETU Unger (System www.enercharge.at)charging location
Operation 24/7 Payment is made directly by credit card or bank card. A payment terminal is installed in the charging station so no charging card is necessary and everyone has access. Betrieb 24/7 Zahlung erfolgt direkt mit Kreditkarte oder Bankkarte. In der Ladestation ist ein Zahlungsterminal eingebaut somit ist keine Ladekarte notwändig und jeder hat Zugang
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Operation 24/7 Payment is made directly by credit card or bank card. A payment terminal is installed in the charging station so no charging card is necessary and everyone has access. Betrieb 24/7 Zahlung erfolgt direkt mit Kreditkarte oder Bankkarte. In der Ladestation ist ein Zahlungsterminal eingebaut somit ist keine Ladekarte notwändig und jeder hat freien Zugang
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
IONITY Göttlesbrunn
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Airport Wiena
1
3
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Flughafen Schwechat Garage Ph 4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
K3 parking
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Stromquelle AM Baugeräte Raasdorf
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Industriepark Eco Plus
Private - For Staff, Visitors or Customers
Operational
Level 3: High (Over 40kW)
CHAdeMO
Ladestation Kurzentrum Ludwigstorff
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ladestation Office [test5]
Public
Unknown
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EVN Public Charging Station (AC).
1
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In