Towne East Squarecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
Electrify America https://www.electrifyamerica.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 1)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Rusty Eck Ford
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Davis-moore Nissan
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Orr Nissan - Wichita
Public - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
HATCHETT FRONT_WEST
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
WATERFRONT STATION 2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Hatchett Devlin Genesis
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
HCA REHAB REHAB STATION 2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
EVERGY @WSU YMCA -413A
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
EVERGY @WSU YMCA-441A
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Upload your own photos for this location: Sign In