NOTL 1charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
ChargePoint http://www.chargepoint.net/ 1-408-841-4500
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
117208
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Unknown Operational Status
- Data Completeness - Equipment Details Present
Type 1 (J1772)
Other Charging Locations
There are 9 matching results
NOTL MAROTTA TWO
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
NOTL RESEV1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
NOTL RESEV3
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
AURA White Oaks Resort
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
White Oaks Conference Resort
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Hilton Garden Inn Niagara on the Lake
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Hilton Garden Inn Niagara on the Lake
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
OPG TOWNLINE 1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
General Motors of Canada Co
Private - Restricted Access
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In