Parcheggio Grandi Funivie Alta Badia | EnelXcharging location
Lun-Dom 8.30-19.00 - parcheggio pubblico a pagamento
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign InRating: 4 out of 5 [ General Comment , Equipment & Location Confirmed Correct ]https://www.forumelettrico.it/forum/colonnina-22kw-ac-parcheggio-cabinovia-piz-la-illa-la-villa-strada-colz-t6639.html
https://www.forumelettrico.it/forum/colonnina-22kw-ac-parcheggio-cabinovia-piz-la-illa-la-villa-strada-colz-t6639.html Comment by polianto 08/14/2019 17:32:37
Other Charging Locations
There are 9 matching results
Associazione Turistica La Villa | EnelX
1
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel La Majun
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel Cristallo
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Ciasa Sopla
2
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel Spa Rosa Alpina
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Hotel Gardenazza ***
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel Fanes
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Neogy 150kw San Cassiano
1
3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hotel Gran Ander ***S
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2020-04-04
Uploaded by polianto on 2019-08-14
Uploaded by polianto on 2019-08-14
Uploaded by polianto on 2019-08-14