Chianciano Terme Baccelli | EnelXcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
EnelX EVA+ Chianciano Terme
3
13
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Grand Hotel Ambasciatori Wellness & Spa
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Chianciano Terme Gramsci | EnelX
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Fattoria San Martino
Public - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Agriturismo Il Molinaccio
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Unknown
Plenitude Etrusco Querce al Pino
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
LeasePlan Ristorante Nonna Rosa Querce al Pino
2
8
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Terre di Nano | GM Green Solution ®
2
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Montichiello Car Park
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In