City of Fayettevillecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily; pay lot 8am-6pm M-F; free after hours
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
52331
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Parking - Center St Lot
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Parking - Meadow Street Municiple Deck
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
South Parking Lot - Blair Library
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Parking Deck - Spring Street
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Central United Methodist Church LR
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Dickson Street Parking
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
City of Fayetteville - Downtown Parking Deck
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
UARK HAPG01
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
UARK GAPG01
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In