City of Roanokecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily; pay lot
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
64394
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CHAdeMO
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Hotel Roanoke and Conference Center - Tesla
Public
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Hotel Roanoke and Conference Center - Tesla Destination
Public
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Lofts on Church - City of Roanoke
Private - Restricted Access
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Virginia Museum of Transportation
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Berglund Center
1
Public
Operational
Level 1 : Low (Under 2kW)
CCS (Type 1)
Magic City Ford Lincoln Isuzu
Public - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Holiday Inn Express Roanoke - Civic Center - Tesla Destination
Public
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Comfort Inn
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
West End Flats
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In