Gorle Cimitero | Ressolarcharging location
Si attiva con l'App Wroom
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Wroom https://wroom.org/ +39 035 36 92 145
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign InRating: 4 out of 5 [ General Comment , Charged Successfully ]Per ora ancora gratuita, presto diventerà a pagamento . https://www.forumelettrico.it/forum/colonnina-ac-ressolar-gorle-via-filippo-turati-t9435.html
https://www.forumelettrico.it/forum/colonnina-ac-ressolar-gorle-via-filippo-turati-t9435.html Comment by polianto 02/22/2020 19:06:41
Other Charging Locations
There are 9 matching results
Municipio di Gorle
2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Valtellina S.p.A.
1
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Italmark
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Torre Boldone Stazione TEB | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Tennis Club Pedrengo | Ressolar
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Bergamo Correnti | ENELX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
A2A BG Fast Corridoni
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
A2A BG Pizzo Scais
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Scanzorosciate Matteotti | Ressolar
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)