Campo Sportivo di Castel Rozzone | Ressolarcharging location
Si attiva con l'App Wroom
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Wroom https://wroom.org/ +39 035 36 92 145
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Per ora accesso gratuito con app Wroom. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-wroom-castel-rozzone-t9253.html
https://www.forumelettrico.it/forum/colonnina-wroom-castel-rozzone-t9253.html Comment by ForumElettrico.it 01/01/2021 17:06:34
Other Charging Locations
There are 9 matching results
Lurano San Lino | Ressolar
1
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Centro Sportivo Treviglio | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Via Brignano
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
LIDL Treviglio
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Via San Zeno
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Concessionario Nissan Arricar Srl
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Treviglio Parcheggio della piscina | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BECHARGE Treviglio Colombo
1
2
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
U2 Supermercato Treviglio | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)