Enel X Way Hotel The Garda Villagecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
SCAME Type 3A (Low Power)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Il parcheggio dovrebbe essere accessibile 24/7 d'estate, ma d'inverno è invece forse tutto chiuso. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-enel-x-way-22-kw-hotel-the-garda-village-sirmione-bs-via-coorti-romane-47-t32030.html
https://www.forumelettrico.it/forum/colonnine-enel-x-way-22-kw-hotel-the-garda-village-sirmione-bs-via-coorti-romane-47-t32030.html Comment by ForumElettrico.it 06/12/2023 05:49:01
Other Charging Locations
There are 9 matching results
Palace Hotel Desenzano
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
A2A Piazza Virgilio
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Gardauno Parcheggio XX Settembre
3
11
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Migross Santa Maria di Lugana
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
A2A Via San Vito
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Gardauno Parcheggio Via Agello
1
9
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel Ocelle
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Bertoldi Boats
1
2
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
NEOGY Parcheggio piscine Desenzano
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2023-06-12
Uploaded by ForumElettrico.it on 2023-06-12
Uploaded by ForumElettrico.it on 2023-06-12
Uploaded by ForumElettrico.it on 2023-06-12
Uploaded by ForumElettrico.it on 2023-06-12