COOP Parco Prato | EnelXcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Lun-Dom 7.30-20.30
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
CCS (Type 2)
CHAdeMO
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Nessun problema con card Hera su CCS2. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/post150834.html#p150834
https://www.forumelettrico.it/forum/post150834.html#p150834 Comment by ForumElettrico.it 11/08/2020 17:28:45
[ General Comment , Equipment & Location Confirmed Correct ] https://www.forumelettrico.it/forum/fast-evad-prato-via-pleiadi-coop-t7016.html Comment by ForumElettrico.it 10/02/2019 16:52:07
Other Charging Locations
There are 9 matching results
Estra Parcheggio Piazza dei Macelli
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Estra Sede
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
GMG SPA Concessionaria Mercedes Benz | EnelX
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Distributore Conad
3
5
Public
Operational
Level 2 : Medium (Over 2kW)
Unknown
Estra Mercatale
2
1
Public - Membership Required
Not Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Parcheggio Serraglio
Public
Operational
Level 2 : Medium (Over 2kW)
SCAME Type 3A (Low Power)
Estra Martini
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Estra Galilei
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eneldrive Fast EVA+ Conad Prato
Public - Membership Required
Planned For Future Date
Level 1 : Low (Under 2kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2020-11-08
Uploaded by ForumElettrico.it on 2019-10-02
Uploaded by ForumElettrico.it on 2019-10-02