BeCharge Milano S. Rafaelcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Equipment & Location Confirmed Correct ]Due posti ben delimitati con colonnina al centro in strada a doppio senso. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/be-charge-presso-greco-shopping-via-de-marchi-t7128.html
https://www.forumelettrico.it/forum/be-charge-presso-greco-shopping-via-de-marchi-t7128.html Comment by ForumElettrico.it 05/04/2020 13:57:31
Other Charging Locations
There are 9 matching results
Be Charge Sammartini
1
2
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
BECHARGE MILANO Sammartini
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Residenza Delle Citta'
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Be Charge Eni
1
7
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Eni
1
6
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
A2A Bicocca
3
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ramada Plaza Milano
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Electra Via Gioacchino Murat
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Stazione Centrale
1
5
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2020-05-04
Uploaded by ForumElettrico.it on 2020-05-04
Uploaded by ForumElettrico.it on 2020-05-04
Uploaded by polianto on 2019-08-07