LIDL Costa Volpinocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Lidl https://info.lidl/en
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign InRating: 5 out of 5 [ General Comment , Charged Successfully ]7 kW
Comment by AndreaCotti-Cometti 02/09/2021 10:42:43
Rating: 1 out of 5 [ Fault Report (Notice To Users And Operator) , Failed to Charge (Equipment Problem) ] Comment by AndreaCotti-Cometti 09/20/2020 11:08:18
Rating: 5 out of 5 [ General Comment , Charged Successfully ] Comment by AndreaCotti-Cometti 12/15/2019 21:44:04
Other Charging Locations
There are 9 matching results
Pisogne Mondolossa | EnelX
1
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Area Sosta Camper - Costa Volpino | RESSOLAR
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Chiesa della Santa Famiglia PIANCAMUNO | BECHARGE
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Parcheggio BRAWO Piancamuno | BECHARGE
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Municipio di Pian Camuno | BeCharge
1
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Pian Camuno Bilgem | BECHARGE
1
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Laghetto di Montecampione | BeCharge
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
A2A
1
3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Municipio di Sovere | RESSOLAR
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by AndreaCotti-Cometti on 2019-09-19