NHP MILANO Bocconicharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Unknown Usage Type
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CHAdeMO
Type 2 (Tethered Connector)
Type 2 (Socket Only)
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign InRating: 2 out of 5 [ Important Notice (For Other Users) , Charged Successfully ]Charger is operational, but Fast Charger only at 33KW. be careful, I recharged for 20 mins at 33KW and I was charged my card 3 times the expected value. I got 11.5kwh and I payed for 33Kwh... impossible to speak with the customer service at the phone, tried more than 10 times to speak with an operator, unsuccesfully. They didn’t responded to email sofar. Very bad service, it’s a pity having a good infrastructure and being unable to manage customers...
Comment by Bobbycar 12/16/2020 11:34:33
[ General Comment , Equipment & Location Confirmed Correct ] https://www.forumelettrico.it/forum/colonnine-nhp-milano-bocconi-t6359.html Comment by ForumElettrico.it 12/17/2019 09:25:34
Other Charging Locations
There are 9 matching results
A2A Isola Digitale Bocconi
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
SCAME Type 3A (Low Power)
A2A Università Bocconi
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Vittadini Park
2
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Electra Porta Lodovica
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
NHP MILANO Aicardo
1
3
(Unknown)
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
NHP Milano Ripamonti
1
1
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Be Charge Scuola Primaria Porta Agnesi
1
4
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
NHP MILANO Ticinese
1
2
(Unknown)
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
A2A Isola Digitale Corso Lodi
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
SCAME Type 3A (Low Power)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2019-12-17
Uploaded by ForumElettrico.it on 2019-12-17
Uploaded by ForumElettrico.it on 2019-12-17
Uploaded by ForumElettrico.it on 2019-12-17