Bon Accord Shopping Centrecharging location
This is an open charge unit installed at the Bon Accord Shopping Centre at George Street, Aberdeen
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
POD Point (UK) http://www.pod-point.com/ 020 7247 4114
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Hiro-Dirk
Type 2 (Socket Only)
Clay-Cole
Type 2 (Socket Only)
Fawn-Neve
Type 2 (Socket Only)
Dean-Nash
Type 2 (Socket Only)
Arne-Luca
Type 2 (Socket Only)
Amos-Khan
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Gallowgate Car Park, Aberdeen
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Gallowgate Car Park
14
5
Public - Membership Required
Partly Operational (Mixed)
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Marischal College, Aberdeen (1)
Public
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Queen Street, Aberdeen
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
West North Street Car Park
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Frederick Street Public Car Park
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Golden Square
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Union Square
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Aberdeen Railway Station, Union Square, Aberdeen
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In