Shoppes at Winter Parkcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily Public - Card key at all times
eVgo Network https://www.evgo.com/
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
93232
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
CHAdeMO
CCS (Type 1)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
OS MANAGED WP CADY WAY PK
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
WINTER PARK
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
VINTAGE WP
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
OS MANAGED WP WARD PARK 01
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Target - Tesla Supercharger
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Westminster Winter Park - Tesla Destination
Public
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Holler Honda
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
The Harbor at Lake Howell
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
OS MANAGED WP LK BALDWIN01
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In