Arrowhead Towne Centercharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily Public - Card key at all times
eVgo Network https://www.evgo.com/
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
93231
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CHAdeMO
CCS (Type 1)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
SEARS - Store #1798 (Arrowhead Glendale)
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Arrowhead Crossing
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Bell Bank station location
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Walmart 3241 (Glendale, AZ)
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Peoria Sports Complex
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
HQ CHARGERS HQ CHARGE SOUTH
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
ARROWHEAD BMW
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
ARROWHEAD BMW GUEST 1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Audi Peoria
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In