Courtyard by Marriott Costa Mesacharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily Public - Card key at all times
eVgo Network https://www.evgo.com/
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
121555
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CHAdeMO
CCS (Type 1)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Courtyard by Marriott Costa Mesa
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
MOTIVE CORONA NEWHOPE 1-2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
ACP MANAGEMENT SUSAN STREET #4
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
ACP MANAGEMENT SUSAN STREET #2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
ACP MANAGEMENT SUSAN STREET #1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Z SUPPLY 3500 HYLAND 01
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Z SUPPLY 3500 HYLAND 02
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
CCC CCC FV 1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
COAST COLLEGES CC/CC FV6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In