ABB San Josecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily Public - Card key at all times
eVgo Network https://www.evgo.com/
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
93741
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CHAdeMO
CCS (Type 1)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
ABB San Jose
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Vocera Communications
Private - Restricted Access
Operational
Level 1 : Low (Under 2kW)
NEMA 14-50
Miraval HOA
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
VTA RIVER OAKS 4
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
MB1201GTB NORTHFIRSTGW1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
PROMETHEUS 550 MORELAND 1
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Hyatt House Santa Clara
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Hyatt House Santa Clara - Tesla Destination
Public
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
VTA
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In