Save Martcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily Public - Card key at all times
eVgo Network https://www.evgo.com/
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
93545
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CHAdeMO
CCS (Type 1)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Save Mart
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
DC CORRIDOR
1
2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
DC CORRIDOR HOLIDAY INN L2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Placer County Risk Management
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Gold Rush Chevrolet
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Placer County Office of Education
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Placer County Personnel Office
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
US Bank Auburn
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
AUB CHERRY MAG 03
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Upload your own photos for this location: Sign In