Brattleboro Memorial Hospitalcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily; for patient use only; drivers must bring their own J1772 cordset for Level 1 charging
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
129331
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
NEMA 5-15R
kW power is an estimate based on the connection type
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Green Mountain Power - Brattleboro
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Price Chopper Plaza - Tesla Supercharger
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Brattleboro, VT Supercharger
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Burger King
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Brattleboro, VT
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Town of Brattleboro
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
124 High St
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Veterans Affairs
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Grove St Chapel
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In