Hotel OCA Santiago de Compostela (Zunder)charging location
Located in front of Puerta del Camino Hotel
Zunder https://www.zunder.com/en/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Efacec QC45 Charger
CHAdeMO
Type 2 (Tethered Connector)
CCS (Type 2)
Hypercharger HYC150 DC charger. Limited to 100kW. DC charger allows charging one vehicle at 100kW, or two simultaneous charges at 50kW.
CCS (Type 2)
Hypercharger HYC150 DC charger. Limited to 100kW. DC charger allows charging one vehicle at 100kW, or two simultaneous charges at 50kW.
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Hotel Puerta del Camino
1
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel Eurostars San Lázaro
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel Los Abetos
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Camping As Cancelas
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Centro Comercial Área Central
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Centro Comercial As Cancelas - Parking Interior
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
ALBERGUE Monte do Gozo
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Centro Comercial As Cancelas - Parking Exterior
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Centro de negocios Costa Vella
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)