Bethel Streetcharging location
Engie rapid charger, 50kW DC, AC is a 22 Kw Socket. One bay for general use, one bay for taxis. Both Free to charge. ev.engie.co.uk £10 overstay fee after 75 mins, then £10 every subsequent 75 mins. completely free to use until 29th October 2021.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
The GeniePoint Network ( EQUANS EV Solutions ) https://www.geniepoint.co.uk/ +44 800 999 4240
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CHAdeMO
CCS (Type 2)
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Equipment & Location Confirmed Correct ] Comment by Dylan_Hudson 01/13/2020 21:09:58
Other Charging Locations
There are 9 matching results
Parsonage Lane Car Park
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Lidl Brighouse
2
1
Public - Membership Required
Unknown
Level 3: High (Over 40kW)
Type 2 (Tethered Connector)
Household Waste Recycling Centre
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Tesco Brighouse
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Crown Service Station
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Brighouse Sports Centre
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
The Lodge at Birkby Hall
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hartshead Moor East Supercharger
Public - Membership Required
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Welcome Break Hartshead Moor East Services
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by Dylan_Hudson on 2020-01-13