Neogy Jaguar Euromix Motorscharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Neogy https://www.neogy.it/ 800 832 855
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Una CCS da 75 kW con accanto una quick, poste all'esterno e funzionanti 24/7. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-neogy-fast-rover-euromix-motors-trento-tn-via-novembre-93-t25538.html
https://www.forumelettrico.it/forum/colonnine-neogy-fast-rover-euromix-motors-trento-tn-via-novembre-93-t25538.html Comment by ForumElettrico.it 03/04/2023 06:33:43
Rating: 5 out of 5 [ General Comment , Charged Successfully ]working ok
Comment by Roberto 06/07/2022 11:19:31
Other Charging Locations
There are 9 matching results
Be Charge Piazzale Lionello Groff
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Evway Top Center
3
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Area di Servizio Delta Energy
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ionity Trento c/o Distributore Eni
3
10
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
LIDL Trento
2
4
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Trento Supercharger
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Interporto Trento
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
CEE 5 Pin
Via del Brennero
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Eni
1
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2023-03-04
Uploaded by ForumElettrico.it on 2023-03-04
Uploaded by Roberto on 2022-06-07