AGSM - Via Porta San Zenocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
AGSM Electrify Verona (IT) https://www.agsm.it/I-servizi/Electrify-Verona
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign InRating: 1 out of 5 [ Important Notice (For Other Users) , Charging Spot Not Accessible (Access locked or site closed) ]off line from 2 month
Comment by Surfer79 04/23/2021 20:38:46
[ General Comment , Charged Successfully ]Il numero da chiamare è un verde di GardaUno, che sembra aver preso la gestione delle colonnine. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-22-kw-via-porta-s-zeno-verona-t7235.html
https://www.forumelettrico.it/forum/colonnina-22-kw-via-porta-s-zeno-verona-t7235.html Comment by ForumElettrico.it 04/21/2020 12:33:34
Rating: 5 out of 5 [ General Comment , Charged Successfully ] Comment by AGSM Verona 02/13/2020 13:05:27
Other Charging Locations
There are 9 matching results
AGSM
1
4
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
AGSM - Piazza Arsenale
2
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Eni Borgo Milano
1
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Stadio
2
1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Via Albere
1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
The Gentleman of Verona - Grand Relais
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Hotel Giberti
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Viale Gianbattista Da Monte
3
8
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel Verona
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2020-04-21
Uploaded by ForumElettrico.it on 2020-04-21
Uploaded by ForumElettrico.it on 2020-04-21
Uploaded by ForumElettrico.it on 2020-04-21
Uploaded by ForumElettrico.it on 2020-04-21
Uploaded by ForumElettrico.it on 2020-04-21
Uploaded by AGSM Verona on 2020-02-13