Fontaneto Fontana | EnelX Fastcharging location
“Lato DC fuori servizio”
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
A26 uscita Borgomanero
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CHAdeMO
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Failed to Charge (Equipment Problem) ]Bella posizione, vicinissima all'uscita dell'autostrada ma immersa nel verde. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/fast-enelx-fontaneto-d-agogna-t9473.html
https://www.forumelettrico.it/forum/fast-enelx-fontaneto-d-agogna-t9473.html Comment by ForumElettrico.it 09/13/2020 05:39:31
Other Charging Locations
There are 9 matching results
A26 Agogna Est
(Unknown)
Unknown
Stazione Cressa Fontaneto | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Cressa Sottini | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Cressa Piazzale del Cimitero | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Bogogno Golf Resort
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Bogogno Martiri | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Municipio Di Bogogno | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Borgomanero XX settembre | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Borgomanero Stadio Comunale | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2020-09-13
Uploaded by ForumElettrico.it on 2020-09-13