ST NIZIER DU MOUCHEROTTE_Place du 14 Avril 1929charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24/24 7/7 jours
eborn https://www.eborn.fr/
data.gouv.fr https://www.data.gouv.fr/fr/datasets/fichier-consolide-des-bornes-de-recharge-pour-vehicules-electriques/
Open License: https://www.etalab.gouv.fr/wp-content/uploads/2014/05/Licence_Ouverte.pdf
FR*S38*P38433*A
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CEE 7/4 - Schuko - Type F
Type 2 (Tethered Connector)
CEE 7/4 - Schuko - Type F
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
ByMyCar Renault Fontaine
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Parking de la concession
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
ByMyCar Fiat Fontaine
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Parking de la concession
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CHAdeMO
Volvo Grenoble
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Seyssinet Pariset - Hôtel de Ville
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
PowerDot - Grand Frais - Seyssins
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
TotalEnergies - Relais du Drac
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ionity Seyssins
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In