To edit, add comments or upload photos: Sign In
B040charging location
Nearest Address:
Place de la mairie - 86240 - Fontaine-le-Comte
France
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Usage:
Public - Pay At Location
Operational Status:
Operational
Latitude:
46.53334
Longitude:
0.26689
OCM Ref: OCM-152132
Access Information:
24/24 7/7 jours
Data Provider:
data.gouv.fr https://www.data.gouv.fr/fr/datasets/fichier-consolide-des-bornes-de-recharge-pour-vehicules-electriques/
Note: This data is sourced automatically, changes should ideally be submitted to the data provider directly.
Data License:
Open License: https://www.etalab.gouv.fr/wp-content/uploads/2014/05/Licence_Ouverte.pdf
Providers Ref:
FR*S86*PSORE*B040
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CEE 7/4 - Schuko - Type F
Operational
OCM-CN-212842
18 kW
AC (Single-Phase)
SCAME Type 3C (Schneider-Legrand)
Operational
OCM-CN-212843
18 kW
CEE 7/4 - Schuko - Type F
Operational
OCM-CN-245700
18 kW
AC (Single-Phase)
SCAME Type 3C (Schneider-Legrand)
Operational
OCM-CN-245701
18 kW
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Tesla Supercharger Poitiers Sud
1.72 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Atlante - Poitiers - Quick
1.81 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
POITIERS SUD 2
1.89 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Auchan, Poitiers Porte Sud
2.05 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
Type 2 (Socket Only)
PowerDot - Ibis Budget - Poitiers Sud
2.12 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Mobilize - Mercedes Poitiers
2.19 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
B110
2.59 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
B122
2.71 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Rue Rabelais
3.28 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In