Il Bell'Arcocharging location
Affittacamere - Holiday Apartament Let - A private apartment in the villa of a wine producing family in the historic center of Massa Marittima with private terrace and courtyard for guests. www.ilbellarco.com [email protected]
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
free for the guests
Tesla (Tesla-only charging) http://www.teslamotors.com
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Affittacamere - Holiday Apartament Let - A private apartment in the villa of a wine producing family in the historic center of Massa Marittima with private terrace and courtyard for guests. www.ilbellarco.com [email protected]
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Enel X Conad
1
2
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Conti di San Bonifacio Wine Resort
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
EnelX Monterotondo Marittimo
1
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ionity AdS Eni
1
3
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Montieri XXV Aprile | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Follonica Raffaello | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Follonica Golino | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Follonica Portogallo | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
FOLLONICA Cassarello | ENELX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In