A2A Piazza della Vittoriacharging location
Public pay parking
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
E-moving (Italy) http://www.e-moving.it/ 800035151
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Situata in un parcheggio interrato, è la colonnina più centrale della città per cui anche quella a più rischio occupazione o abusivismo. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-a2a-22-kw-brescia-bs-piazza-della-vittoria-7-t28935.html
https://www.forumelettrico.it/forum/colonnina-a2a-22-kw-brescia-bs-piazza-della-vittoria-7-t28935.html Comment by ForumElettrico.it 12/08/2022 15:34:14
Other Charging Locations
There are 9 matching results
A2A Piazza della Vittoria
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
PARCHEGGIO Piazza del Mercato A2A BS
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
A2A XX Settembre
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
PARCHEGGIO Stazione A2A BS
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
A2A Stazione FS
1
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BE CHARGE Piazza della Repubblica
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PARCHEGGIO Fossa Bagni A2A BS
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
A2A BS Via Sostegno
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
A2A Fast
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-12-08
Uploaded by ForumElettrico.it on 2022-12-08
Uploaded by ForumElettrico.it on 2022-12-08
Uploaded by ForumElettrico.it on 2022-12-08
Uploaded by ForumElettrico.it on 2022-12-08