Centro Porsche Milano Estcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]All'interno del piazzale recintato, nella zona accessibile ai visitatori. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/centro-porsche-milano-est-via-rubattino-94-milano-t8421.html
https://www.forumelettrico.it/forum/centro-porsche-milano-est-via-rubattino-94-milano-t8421.html Comment by ForumElettrico.it 12/31/2020 17:44:29
Other Charging Locations
There are 9 matching results
Decathlon Segrate
1
3
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnelX EVAD Sede Enel MI Rubattino
2
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
MediaWorld Rubattino
2
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge MediaWorld
1
3
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Elektra Aldi
1
3
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Eneldrive Parcheggio Via Olgia
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Friem
1
4
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Park In Linate
2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
ParkinGO LINATE
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2020-12-31
Uploaded by ForumElettrico.it on 2020-12-31
Uploaded by ForumElettrico.it on 2020-12-31