Be Charge San Vitocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Nessun problema passando card Enel X Way sulla presa di destra e poi infilando il cavo (mentre infilando prima il cavo mi dava stranamente errore). Leggi la recensione completa qui: https://www.forumelettrico.it/forum/post346384.html#p346384
https://www.forumelettrico.it/forum/post346384.html#p346384 Comment by ForumElettrico.it 11/10/2022 12:09:28
[ General Comment , Charged Successfully ]Di fronte c'è un piccolo circolo Arci con bar, anche all'aperto. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-spilamberto-mo-via-antonio-pacinotti-2-san-vito-t10689.html
https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-spilamberto-mo-via-antonio-pacinotti-2-san-vito-t10689.html Comment by ForumElettrico.it 06/02/2020 10:05:50
Other Charging Locations
There are 9 matching results
Be Charge Parco del Guerro San Vito
2
7
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnelX EVA+ Spilamberto
2
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Modena Supercharger
2
9
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Emobitaly Hotel Real Fini Baia Del Re
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Atlante Municipio
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Eneldrive Sole
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BECHARGE SPILAMBERTO Tintori
2
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ca' di Sola Resistenza | EnelX
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Atlante
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-11-10
Uploaded by ForumElettrico.it on 2020-06-02
Uploaded by ForumElettrico.it on 2020-06-02
Uploaded by ForumElettrico.it on 2020-06-02
Uploaded by ForumElettrico.it on 2020-06-02
Uploaded by ForumElettrico.it on 2020-06-02