Hydro One Inccharging location
Planned for future date. Not Operational.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
156666
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CHAdeMO
kW power is an estimate based on the connection type
CCS (Type 1)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
MITSUBISHI PEMB
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
MITSUBISHI PEMB SHOP CHARGER
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Glenergy
1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Pembroke Memorial Centre
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Pembroke and Area Community Access Centre
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Pembroke Waterfront
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Ottawa River Energy Solutions
Private - Restricted Access
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Best Western - Pembroke Inn
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Scotiabank Pembroke
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Upload your own photos for this location: Sign In