ZapGrid Ostigliacharging location

This charging location has not been recently verified and you should not rely solely on this information for journeys.

If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.

If the details are inaccurate please edit them.

Number Of Stations/Bays: 1
Usage: Public
Usage Cost: 0.40€ /kWh
Operational Status: Operational
Latitude: 45.556111
Longitude: 11.930672
OCM Ref: OCM-161534
Network/Operator

ZapGrid https://www.zapgrid.net/

Data Provider:

Open Charge Map Contributors http://openchargemap.org

Data License:

Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report


Data Quality Score: 90 out of 100
  •   User Feedback - No recent user verification.
  •   User Feedback - Has comments or check-ins
  •   User Feedback - Has photos
  •   Data Completeness - Usage Type Known
  •   Data Completeness - Operational Status Known
  •   Data Completeness - Equipment Details Present

Type 2 (Socket Only)

Status Unknown
2 Present
OCM-CN-232466
16 kW AC (Three-Phase)

Add your own comment/check-in for this location:

Sign In
[ General Comment , Charged Successfully ]

La ricarica è a pagamento per un massimo di 2 ore a 0,40 €/kWh. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-scame-presso-centro-commerciale-ostiglia-camposampiero-pd-t8986.html

https://www.forumelettrico.it/forum/colonnina-scame-presso-centro-commerciale-ostiglia-camposampiero-pd-t8986.html Comment by ForumElettrico.it 07/15/2020 16:49:32

Other Charging Locations

There are 9 matching results

ON Via Palladio
 

Via Palladio
Camposampiero
Veneto
35012
Italy
View
1.12 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

BECHARGE Trattoria Nalin Campodarsego
 

Via Bassa I, 119
Campodarsego
PD
35011
Italy
View
4.9 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Nextcharge
 

Via Dell' Artigianato 33
Villa Del Conte
Veneto
35019
Italy
View
5.27 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

EWIVA Fast Via Provinciale
 

Via Provinciale 19
Campo San Martino
Veneto
35010
Italy
View
5.57 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

BECHARGE Punto Centro Commerciale Campo San Martino
 

Via Provinciale, 2
angolo Via G. Mazzini
Campo San Martino
PD
35010
Italy
View
5.59 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

ENEL X Strada Battaglia
 

Strada Battaglia
Trebaseleghe
Padova
35010
Italy
View
5.87 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Be Charge Via Valsugana
 

Via Valsugana
San Giorgio in Bosco
Veneto
Italy
View
6.37 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Cappelletta Centro | EnelX
 

Via Cappelletta Centro
Cappelletta
Noale
VE
30033
Italy
View
6.4 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Be Charge Via del Donatore
 

Via del Donatore
San Giorgio in Bosco
Veneto
Italy
View
6.4 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Upload your own photos for this location: Sign In

Uploaded by ForumElettrico.it on 2020-07-15

Uploaded by ForumElettrico.it on 2020-07-15