Lubriano Col di Lana | EnelX charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
SCAME Type 3A (Low Power)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Abbiamo diversi ristoranti, bar o negozi dove passare piacevolmente il tempo della ricarica. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-enel-x-22-kw-lubriano-vt-piazza-col-di-lana-111-t11646.html
https://www.forumelettrico.it/forum/colonnina-enel-x-22-kw-lubriano-vt-piazza-col-di-lana-111-t11646.html Comment by ForumElettrico.it 07/26/2020 06:49:31
Other Charging Locations
There are 9 matching results
Enel X Civita
1
7
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X
3
8
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Eneldrive S. Andrea
2
7
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Distributore Esso Orvieto Scalo
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel Gialletti Orvieto Scalo
1
3
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnelX EVA+ C.C. Porta d'Orvieto
3
12
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Free To X AdS Tevere Est
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Bolsena Lungolago | EnelX
2
9
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Barberani Wine Company
1
Private - For Staff, Visitors or Customers
Operational
Level 3: High (Over 40kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2020-07-26
Uploaded by ForumElettrico.it on 2020-07-26
Uploaded by ForumElettrico.it on 2020-07-26
Uploaded by ForumElettrico.it on 2020-07-26
Uploaded by ForumElettrico.it on 2020-07-26