Hotel Casale Colli del Trontocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Repower (Italy) https://www.repower.com/it/la-mobilita-elettrica/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Due colonnine ma una delle due dotate di 2 prese tipo 2... per cui tre prese in tutto. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnine-22-kw-hotel-casale-colli-del-tronto-ap-via-casale-superiore-146-t12053.html
https://www.forumelettrico.it/forum/colonnine-22-kw-hotel-casale-colli-del-tronto-ap-via-casale-superiore-146-t12053.html Comment by ForumElettrico.it 08/15/2020 14:17:51
Other Charging Locations
There are 9 matching results
BeCharge Stazione di Colli del Tronto
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Stella
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
RemaTarlazzi S.p.A.
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X AdS Conad Stella
3
9
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ewiva Villa Pigna
4
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Supermercato Tigre Monticelli | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eneldrive AP Commercio
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
SCAME Type 3A (Low Power)
Monticelli Iris | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Largo degli aranci
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2020-08-15
Uploaded by ForumElettrico.it on 2020-08-15
Uploaded by ForumElettrico.it on 2020-08-15
Uploaded by ForumElettrico.it on 2020-08-15
Uploaded by ForumElettrico.it on 2020-08-15
Uploaded by ForumElettrico.it on 2020-08-15